CHAP Group Welcomes Paul Matthew as Area Construction Director
CHAP Group is delighted to introduce Paul Matthew as our newly appointed Area Construction Director for the Tayside region. With over 35 years’ experience within the construction industry, Paul brings a wealth of experience and expertise that . . .
CHAP Group’s Charity Golf Tournament Swings into Success, Raising £10,000 for Charlie House
The Annual CHAP Charity Golf Day witnessed an extraordinary display of generosity, camaraderie and golfing prowess at Newmachar Golf Club. This was more than just a day on the greens; it was a commitment to making a real difference in the lives . . .
CHAP Group Welcomes John Scott as New Design Manager
CHAP Group is delighted to introduce John Scott as our newly appointed Design Manager. Formerly serving as the Technical Director at a prestigious Scottish architectural firm, John brings a wealth of experience and expertise that will enhance . . .
Completed to a very tight timescale during the College summer recess in 2014, this project comprised the full strip out, reconfiguration and refitting of the main Engineering Workshop.
The workshop layout was re-configured to provide an open plan facility, which was fully serviced with new high quality floor treatment installed, re-installation of existing equipment and the installation of new engineering equipment.
The building remained in use by staff throughout the works and all other facility operations remained functional.