Project

March Road, Buckie
Roads, Infrastructure & Industrial Unit


Construction of a garage building, new roads infrastructure, including pavements, cycle lanes and street lighting, drainage and servicing

Automotive Workshop/Garage

A single storey automotive garage building consisting of:

  • strip and pad foundations,
  • steel portal frame
  • concrete floor slab
  • metal composite panel roof
  • external wall cladding
  • aluminium windows
  • steel doors and roller shutter doors
  • internal office consisting of timber stud partitions
  • reception area
  • toilet facilities

All associated services, paved car parking area and yard with fenced boundary.

Industrial Estate

Construction of access road (approximately 200m) and infrastructure including footpaths, cycle paths and street lighting together with the installation of services including foul and surface water including SUDs provision, water, electric and telecommunications.

Landscaping over the site of approximately 7.5 hectares. Works also include the diversion of an overhead 11,000volt electricity line.

location :

Rathven, Buckie


engineer :

Moray Council


surveyor :

Moray Council


duration :

23 weeks