CHAP achieves ISO 45001
Following a rigorous auditing period, we are delighted to have been awarded ISO 45001 certification for our Occupational Health and Safety Management System.
Led by Group QHSE Advisor, Eddie Runcie, the comprehensive virtual audit covered . . .
CHAP Group supports local good causes
CHAP Group’s site team at the Aberdeen City Council Summerhill development have been busy over the past few weeks gathering a selection of toys and food to donate to Instant Neighbour and The Archie Foundation this Christmas.
CHAP Group . . .
Major milestones achieved at Summerhill
Two major milestones have been reached at CHAP Group’s social housing project at Summerhill. The works to construct 369 flats on behalf of Aberdeen City Council have taken delivery of a large tower crane and the first timber kits in the past . . .
The project involved the complete strip-out, major internal structural alterations and reconstruction of existing student accommodation, to create a development of luxury town-houses and flats.
All of the existing internal building fabric was removed and new steel beams inserted throughout the two buildings to cater for the new design loads. This allowed for the creation of large openings throughout the structure for stairwells and lift-shafts. The external envelope of each building was also completely renovated, with the pointing repaired, all windows replaced and the granite power-washed following a complete re-roofing of each building.