CHAP Group Welcomes Paul Matthew as Area Construction Director
CHAP Group is delighted to introduce Paul Matthew as our newly appointed Area Construction Director for the Tayside region. With over 35 years’ experience within the construction industry, Paul brings a wealth of experience and expertise that . . .
CHAP Group’s Charity Golf Tournament Swings into Success, Raising £10,000 for Charlie House
The Annual CHAP Charity Golf Day witnessed an extraordinary display of generosity, camaraderie and golfing prowess at Newmachar Golf Club. This was more than just a day on the greens; it was a commitment to making a real difference in the lives . . .
CHAP Group Welcomes John Scott as New Design Manager
CHAP Group is delighted to introduce John Scott as our newly appointed Design Manager. Formerly serving as the Technical Director at a prestigious Scottish architectural firm, John brings a wealth of experience and expertise that will enhance . . .
Design and Build of a four storey social housing development to provide 20 2-bed flats complete with associated parking, site works, external services and drainage.
The construction is block work foundations with concrete ground floors with block work external walls with a roughcast, granite and weatherboard timber finish, timber structural kit, the roof is constructed in kit timber trusses with a tile finish; full electrical system and gas fired heating and hot water system; site finishes include tarmac, paving blocks, soft and hard landscaping.
The project was registered with the Considerate Constructor Scheme (CCS) and was awarded a “Beyond Compliance” Certificate.