CHAP Group Welcomes Paul Matthew as Area Construction Director
CHAP Group is delighted to introduce Paul Matthew as our newly appointed Area Construction Director for the Tayside region. With over 35 years’ experience within the construction industry, Paul brings a wealth of experience and expertise that . . .
CHAP Group’s Charity Golf Tournament Swings into Success, Raising £10,000 for Charlie House
The Annual CHAP Charity Golf Day witnessed an extraordinary display of generosity, camaraderie and golfing prowess at Newmachar Golf Club. This was more than just a day on the greens; it was a commitment to making a real difference in the lives . . .
CHAP Group Welcomes John Scott as New Design Manager
CHAP Group is delighted to introduce John Scott as our newly appointed Design Manager. Formerly serving as the Technical Director at a prestigious Scottish architectural firm, John brings a wealth of experience and expertise that will enhance . . .
Construction of the main Control Building and the Principal SVC Process Building for the Beatrice Offshore Windfarm
This project comprised the construction of two steel framed metal clad buildings which provided the main Control Building and the Principal SVC Process Building for the Beatrice Offshore Windfarm.
Both buildings were highly serviced with deep raised flooring systems and electromagnetic shielding incorporated into the building fabric. The buildings also had an enhanced level of fire protection plus blast proof features.
The electrical services not only provided general lighting and power but were integrated into the main operational grid process systems and included fire and security installations. Mechanical services comprised extensive ventilation, cooling and climate control as well as standard domestic services. Full BMS control systems were incorporated.
Each building comprise:
Internally the units include: